Solar Cell Cutting
- proper solar cell sorting is an important first step in the manufacturing process.For the majority of PV manufacturers for example in China, solar cell sorting is done manually.
MBB Welding
- proper solar cell sorting is an important first step in the manufacturing process.For the majority of PV manufacturers for example in China, solar cell sorting is done manually.
String Welding
- proper solar cell sorting is an important first step in the manufacturing process.For the majority of PV manufacturers for example in China, solar cell sorting is done manually.
Type Setting
- proper solar cell sorting is an important first step in the manufacturing process.For the majority of PV manufacturers for example in China, solar cell sorting is done manually.
MBB Setting
- proper solar cell sorting is an important first step in the manufacturing process.For the majority of PV manufacturers for example in China, solar cell sorting is done manually.
EL Detection
- proper solar cell sorting is an important first step in the manufacturing process.For the majority of PV manufacturers for example in China, solar cell sorting is done manually.
High Temperature Lamination
- proper solar cell sorting is an important first step in the manufacturing process.For the majority of PV manufacturers for example in China, solar cell sorting is done manually.
Automatically Install Borders
- proper solar cell sorting is an important first step in the manufacturing process.For the majority of PV manufacturers for example in China, solar cell sorting is done manually.
Surface Checking
- proper solar cell sorting is an important first step in the manufacturing process.For the majority of PV manufacturers for example in China, solar cell sorting is done manually.
Cleaning And IV Testing
- proper solar cell sorting is an important first step in the manufacturing process.For the majority of PV manufacturers for example in China, solar cell sorting is done manually.
Rigid Quality Control
Stringent quality control is the cornerstone of JM Solar's manufacturing. Our customers have come to expect uncompromising quality standards in our products. To meet this expectation of high quality, we continue to invest in state-of-the art equipment and professional training of our employees. We are proud of our product quality and their reliable performance even in the most extreme conditions.JM Solar has received certifications for Quality Management System (ISO 9001:2015), Environment Management System (ISO 14001:2015) and Occupational Health and Safety Management System (ISO45001:2018) from both DNV GL and GZCC.
Solar Cell String EL Testing
Each solar PV cell string must be tested by EL machine to ensure every single solar cell is perfect.
EL Testing Before Lamination
Each Solar Module must be tested by EL machine before lamination to ensure every solar cell string is perfect.
Appearance Inspection After Lamination
Each Solar Module must be inspected by QC after lamination to ensure there is no defect during lamination.
Final EL Testing
Final EL Testing 100% ensure zero internal electric defect for each solar module.
Output Power Testing
Output power testing ensure 100% positive power tolerance and excellent power performance.
Final Appearance Inspection
Each Solar Module must be inspected by QC before packaging to ensure there is no defect during production process.